通过Flowmaster瞬态仿真分析,对船舶泵阀移水系统水锤抑制方法进行研究。结果表明,阀快速关闭时,系统中存在明显的水锤现象;延长阀关闭时间和采用两阶段关闭的策略,可以有效地抑制系统水锤冲击;阀离泵组越近,对水锤抑制效果越好;管路中加装蓄能元件也能有效抑制水锤。
The method of water hammer suppression of the marine moving water system by pump and valves was studied through transient simulation analysis of Flowmaster. The results show that when the valve is closed rapidly, there is an obvious water hammer in the system. Extend the valve closing time and the two stage closure strategy can be used to effectively suppress the impact of water hammer in the system; the closer of control valve from the pump, the water hammer suppression effect was better. Pipeline installation of energy storage components can also effectively inhibit the water hammer.
2017,39(1): 96-99,103 收稿日期:2016-06-24
DOI:10.3404/j.issn.1672-7619.2017.01.019
分类号:U270;TB53
作者简介:李斌(1988-),男,硕士,工程师,研究方向为船舶系统设计。
参考文献:
[1] 杨丽. 长距离大型区域压力流输水系统水锤防护计算研究[D]. 西安:长安大学, 2009. YANG Li. The reaserch on the protection of water hammer in large-scale regional, pressure flow and long distance water supply system[D]. Xi'an:Chang'an University, 2009.
[2] 陈卓, 王中. 输水管路水力计算对水锤防护措施的影响[J]. 西藏大学学报, 2012, 27(2):116-123. CHEN Zhuo, WANG Zhong. The reaserch on hydraulic calculation of water hammer[J]. Journal of Tibet University, 2012, 27(2):116-123.
[3] 龙侠义. 输配水管线水锤数值模拟与防护措施研究[D]. 重庆:重庆大学, 2013. LONG Xia-yi. Numerical simulation and protection measures of water hammer in transmission and distribution pipeline[D]. Chongqing:Chongqing University, 2013.
[4] 刘波. 无负压加压泵站在跨海输水管线中的水锤防护性能研究[D]. 杭州:浙江大学, 2013. LIU Bo. Study on water hammer protection performance of non-negative pressure pumping station in cross sea-water pipeline[D]. Hangzhou:Zhejiang University, 2013.
[5] 李良庚, 雷冬梅. 泵站水锤及防护[J]. 机电设备, 2015(1):37-40. LI Liang-geng, LEI Dong-mei. Prevention of water hammer in pump station[J]. Mechanical and Electrical Equipment, 2015(1):37-40.