“福特”级航母是对“尼米兹”级航母的一次彻底革新,在总体、动力、电子、航空保障等方面采用了大量新技术。但自研制以来,“福特”级航母电磁弹射器、先进阻拦装置、双波段雷达、先进武器升降机、动力系统等重要系统多次出现问题,且部分重要性能也没有达到最初预想目标,并导致了费用超支和项目延期。本文对这些重点问题进行梳理和分析,并针对我国航母的发展提出启示。
Ford-class aircraft carrier is a thorough reform of Nimitz-class aircraft carrier, adopting a large number of new technologies in general, power, electronics, aviation support and other aspects. However, since its development, it has repeatedly encountered problems with its electromagnetic catapult, advanced arresting gear, dual band radar, advanced weapon elevator, power system and other key systems, and some important performance has not met the initial expected goal, resulting in cost overruns and project delays. This paper sorted out and analyzed these problems and put forward enlightenment for our country.
2022,44(9): 186-189 收稿日期:2021-11-23
DOI:10.3404/j.issn.1672-7649.2022.09.040
分类号:U674.771
作者简介:陈练(1980-),男,硕士,高级工程师,研究方向为舰船总体与情报
参考文献:
[1] Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget [R]. GAO. August 2007.
[2] PARWATE S , et al. Electromagnetic aircraft launch system [J]. IJARIIE. 2017, 3(2).
[3] KAHLON A S , et al . A brief review on electromagnetic aircraft launch system [J]. International Journal of Mechanical and Production Engineering, 2017, 5(6).
[4] JOHNSON C. Officials: ship can handle load: launcher on CVN-21 overweight, but navy says carrier program ok [J]. Inside the Navy, 2007,20(4).
[5] Oversight of the electromagnetic aircraft launch system [M]. House Hearing, 111 Congress, July 16, 2009.
[6] Ronald O'Rourke. Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress [R]. CRS. July 2009.
[7] EMALS suffers setback on first aircraft launch [J]. Military Aviation News, May 13, 2010.
[8] Director,operational test and evaluation [R]. FY 2020 Annual Report, January 2021.
[9] CAVAS C P. Carrier Ford has serious power Problem [EB/OL]. Defense News. Sep 19, 2016.
[10] MIZOKAMI K. America's newest aircraft carrier suffers a breakdown [EB/OL]. Popular Mechanics. May 8, 2018.
[11] FARAM M D, Why the Navy′s newest aircraft carrier was forced back into port [EB/OL]. NavyTimes, May 23, 2018.
[12] PICKRELL R, The US Navy fixed the propulsion problems on its $13 billion supercarrier, but the ship still has serious issues [EB/OL]. NavyTimes, Aug. 14, 2019.
[13] Ford-class aircraft carrier congress should consider evising cost cap legislation to include all construction costs [R]. GAO, November 2014.
[14] Ford-class Carriers lead ship testing and reliability shortfalls will limit initial fleet capabilities [R]. GAO, September 2013.